How is the quality control of the equipment installation

The quality control during the equipment installation preparation stage: (1) examine and install the installation and installation of the installation and installation of the construction plan for the construction organization. (2) check the operating conditions, such as road transportation, water, electricity, gas, lighting and fire control facilities; main material, tools and corresponding to whether the implementation of labor, civil construction is to meet the installation requirements. The installation process with constant temperature and humidity, shockproof, dustproof, anti radiation requirements are the corresponding guarantee measures. When the weather conditions are unfavorable if there are corresponding measures. (3) the building structure is used as a lifting and handling equipment to bearing point is whether the structure bearing capacity of La accounting, whether the consent of the design units have to agree. (4) the equipment, apparatus, instrument, instrument and apparatus used in the installation of the equipment shall be measured in accordance with the measure (accuracy grade shall not be lower than the accuracy grade of the inspected object). (5) check the installation unit to establish the quality management system is established and sound, and urge them to continue to improve.
The quality control of the equipment installation process is mainly including: the basic inspection of equipment, the position of the equipment, the adjustment of the different working procedure such as the two grouting. (a) equipment installation process quality control points: (1) the installation process of the hidden works, concealed must be checked and accepted before entering the next process. (2) equipment installed to adhere to the self construction personnel inspection, the next working procedure to mutual inspection, installation unit full-time quality control personnel have special inspection and supervision engineer must re and sampling) and checked and recorded for each process. (3) the installation process used materials, such as cleaning agent, grease, lubricant, fasteners, must conform to the product design and standard requirements, with a factory certificate and installation unit self inspection results. (two) the equipment foundation shall be inspected by the installation unit before the installation is in place, and shall be submitted to the supervision engineer for inspection after the qualification of the equipment is tested..
General inspection is the basis of geometric size, location, concrete strength and other items. The engineer to check the equipment foundation and acceptance should also note: where the surface of the base to template, anchor bolt, fixing frame and reveal the basic outside bars must be removed.